• Login
    View Item 
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Comparison between automated and manual DSM pumping projects

    Thumbnail
    View/Open
    Scanned Dissertation (35.98Mb)
    Dissertation (2.495Mb)
    Date
    2008
    Author
    Richter, Rudolph Petrus
    Metadata
    Show full item record
    Abstract
    The purpose of this dissertation is to identify the best alternative method of load shifting on clear water pumping systems in the mining industry. This can be done through a comparison analysis between manual and automated Demand Side Management (DSM) projects. The study holds benefits for Eskom and any client wishing to participate in the program. Eskom, by choosing the best method, will ensure sustainable load shifting while the client benefits financially through lower electricity costs. In order to perform this study, research was conducted on the requirements for additional electricity supply in South Africa. Research showed that there is an urgent requirement for additional electricity supply to ensure continued economical growth. DSM was identified as one of the most favourable methods that could be implemented to address the problem. A reason for this is DSM projects are economically viable and can be implemented in a relatively short time. The initiative would also decrease the need for increasing electrical generation capacity. During the research study important information regarding the computation process for load shifting and cost saving performance was gathered. Research was also conducted on the effect of DSM on labour and maintenance cost reduction, as well as economical engineering methods that can be used for alternative selection. The difference in performance between automated and manual systems was compared. The results showed that a 40% improvement of automated systems over manual systems were attainable and sustainable. This will realise a total saving of approximately 45% in electricity costs for the client. Savings in labour and maintenance costs are shown to be achievable through the automation of pumping systems. These saving results were used in the Engineering Economic alternative selection methods where applicable. Economic calculations confirmed that automated projects are the most viable control method. From the comparison study, it is shown that automated controlled systems are more advantageous than manually controlled systems. It will therefore be in the best interest of the client to automate a manually controlled pumping system, as it will result in additional load shifting and cost saving.
    URI
    http://hdl.handle.net/10394/2329
    Collections
    • Engineering [1424]

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of NWU-IR Communities & CollectionsBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis Type

    My Account

    LoginRegister

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV