• Login
    View Item 
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost savings on mine dewatering pumps by reducing preparation– and comeback loads

    Thumbnail
    View/Open
    Cilliers_C.pdf (3.400Mb)
    Date
    2014
    Author
    Cilliers, Charl
    Metadata
    Show full item record
    Abstract
    Using chilled water within South African gold mines is paramount to the purpose of extracting gold ore efficiently. Using water for cooling, drilling and sweeping and the release of underground fissure water causes the accumulation of vast amounts of water in underground dams. Deep mines use cascading pump systems for dewatering, which is an electrical energy intensive dewatering method. Due to the recent equalisation of demand to generation capacity of electrical energy in South Africa, various methods towards demand side reduction have been implemented. With the introduction of a time-of-use (TOU) tariff structure by Eskom, the implementation of projects that shift load from peak TOU times to times of the day when electrical energy is less expensive has increased. To enable load shifting on mine dewatering pumps, preparation before and recovery after peak TOU is needed for effective results. This induces a preparation- and comeback load in the standard TOU. With an annual increase in TOU tariffs and the rate of increase of standard TOU being greater than that of the peak TOU, a reduction in electrical energy consumption before and after peak TOU is needed. To enable this, a step-by-step control technique was developed to promote the shifting of load from standard- to off-peak TOU, while still realising a full load shift from peak TOU. This technique entails dynamic control ranges of underground dam levels as opposed to the conventional constant control range method. Two case studies were used to test the developed technique. Results indicated significant additional financial savings when compared to conventional control methods. Additional savings of R1,096,056.65 and R579,394.27 per annum were respectively achieved for both case studies.
    URI
    http://hdl.handle.net/10394/10835
    Collections
    • Engineering [1424]

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of NWU-IR Communities & CollectionsBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis Type

    My Account

    LoginRegister

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV