Development of a lean optimisation plan for a wire manufacturing process
| dc.contributor.advisor | Coetzee, R. | en_US |
| dc.contributor.author | Shongwe, M. | en_US |
| dc.contributor.researchID | 13033166 - Coetzee, Rojanette (Supervisor) | en_US |
| dc.date.accessioned | 2020-03-05T12:37:25Z | |
| dc.date.available | 2020-03-05T12:37:25Z | |
| dc.date.issued | 2019 | en_US |
| dc.description | MSc (Development and Management Engineering), North-West University, Potchefstroom Campus | |
| dc.description.abstract | The growing demand for maximum operational efficiency has driven organisations towards implementing lean manufacturing as a management philosophy. However, a gap still exists between the available information on lean manufacturing practices in the automobile industry and the non-automotive sectors in South Africa. The primary focus of this research was to establish which lean principles are applicable to a continuous manufacturing environment and to identify existing process and optimisation challenges within a wire-manufacturing process. A literature study was conducted to determine the differences between the application of the lean philosophy in a discrete and continuous manufacturing setting. The material and information flow of the wire manufacturing was further mapped using both a current and an ideal future state value stream map (VSM). The study also incorporated an empirical approach to measure the "leanness" of the wire-manufacturing process by using an efficiency, flow and variability (EFV) metric. Lastly, an aggregate root cause analysis (RCA) was conducted with a chartered team who had knowledge on the subject matter. The EFV metric suggests that the wire-manufacturing process falls within the "potential for improvement" region and that non-value-added waste can be reduced by 36.6% when kaizen (continuous improvement) methods are used. However, analysis of the RCA points to process variables being the most dominant optimisation challenges. The findings from this study were summarised using a Hoshin Kanri matrix. An iterative Delphi technique was used to verify the Matrix based on a 24-item questionnaire. The study in hand adopts a structured approach to support the applicability of lean principles and suggests that such an approach can be adapted to manufacturing environments similar to the case study. | en_US |
| dc.description.thesistype | Masters | en_US |
| dc.identifier.uri | https://orcid.org/0000-0002-0830-8869 | en_US |
| dc.identifier.uri | http://hdl.handle.net/10394/34265 | |
| dc.language.iso | en | en_US |
| dc.publisher | North-West University (South Africa) | en_US |
| dc.subject | Continuous manufacturing | en_US |
| dc.subject | Delphi technique | en_US |
| dc.subject | Discrete manufacturing | en_US |
| dc.subject | Hoshin Kanri matrix | en_US |
| dc.subject | Just-in-time | en_US |
| dc.subject | Lean | en_US |
| dc.subject | Leanness | en_US |
| dc.subject | Optimisation | en_US |
| dc.subject | Toyota production system | en_US |
| dc.subject | Value stream mapping | en_US |
| dc.subject | Root cause analysis | en_US |
| dc.title | Development of a lean optimisation plan for a wire manufacturing process | en_US |
| dc.type | Thesis | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 7.1.11.7.4 Shongwe M 25751255.pdf
- Size:
- 4.41 MB
- Format:
- Adobe Portable Document Format
- Description:
