NWU Institutional Repository

A groundwater-planning toolkit for the main Karoo basin: identifying and quantifying groundwater-development options incorporating the concept of wellfield yields and aquifer firm yields

dc.contributor.authorMurray, R.
dc.contributor.authorDennis, R.
dc.contributor.authorBaker, K.
dc.contributor.authorRavenscroft, P.
dc.contributor.authorMusekiwa, C.
dc.contributor.researchID13234684 - Dennis, Stefanus Rainier
dc.date.accessioned2016-05-26T14:05:43Z
dc.date.available2016-05-26T14:05:43Z
dc.date.issued2012
dc.description.abstractThis paper provides an overview of groundwater-planning tools that were developed during a Water Research Commission project that was initiated due to the need to place the significant knowledge on groundwater of the Karoo Basin within the realms of water resource planning. In essence, the project aimed to identify favourable areas of groundwater potential for bulk municipal water supplies, to provide a method to quantify them, and to package the information so that it is assessable for planning purposes. In identifying favourable groundwater areas, the focus turned to developing a detailed transmissivity map of the Main Karoo Basin. In order to present yields in an accessible manner to water-supply planners, the same concept used in surface-water resource assessments and dam or reservoir design were adapted and applied to groundwater. Two methods were developed, namely the Aquifer Assured Yield Model and the Aquifer Firm Yield Model (the latter of which was developed into a software package together with the other products). The Aquifer Firm Yield Model provides the historical firm yield and uses historical monthly rainfall data together with recharge, evapotranspiration and baseflow to determine aquifer storage in any given month. The firm yield can be considered to define the upper limit of the groundwater resource. In order to establish possible wellfield yields, the C-J Wellfield Model (based on the Cooper-Jacob approximation of the Theis groundwater-flow equation) was developed whereby borehole spacing can be optimised after inputting estimated transmissivity values from the transmissivity map. To aid the planning process, groundwater-quality maps were produced together with the Wellfield Cost Model which provides an easy way to obtain first-order cost estimates of the wellfield options. This paper briefly describes these 'tools' that were produced and provides slightly more detail on how the transmissivity maps were developeden_US
dc.description.sponsorshipWater Research Commissionen_US
dc.identifier.citationMurray, R. et al. 2012. A groundwater-planning toolkit for the main Karoo basin: identifying and quantifying groundwater-development options incorporating the concept of wellfield yields and aquifer firm yields. Water SA, 38(3):407-416. [http://www.wrc.org.za/Pages/KH_WaterSA.aspx?dt=5&L0=1&L1=4]en_US
dc.identifier.issn0378-4738
dc.identifier.issn1816-7950 (Online)
dc.identifier.urihttp://hdl.handle.net/10394/17509
dc.identifier.urihttp://www.wrc.org.za/Pages/KH_WaterSA.aspx?dt=5&L0=1&L1=4#
dc.identifier.urihttp://dx.doi.org/10.4314/wsa.v38i3.6
dc.language.isoenen_US
dc.publisherSouth African Water Research Commissionen_US
dc.subjectAquifer yielden_US
dc.subjectwellfield yielden_US
dc.subjecttransmissivityen_US
dc.subjectwater-balance modelsen_US
dc.subjectgroundwater qualityen_US
dc.subjectwell-field costsen_US
dc.titleA groundwater-planning toolkit for the main Karoo basin: identifying and quantifying groundwater-development options incorporating the concept of wellfield yields and aquifer firm yieldsen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Water SA-2012-38(3)-407.pdf
Size:
1.68 MB
Format:
Adobe Portable Document Format
Description: