Statistiese beheer van die gewigte van sementsakkies in 'n verpakkingsaanleg
Loading...
Files
Date
Authors
Researcher ID
Supervisors
Journal Title
Journal ISSN
Volume Title
Publisher
North-West University (South Africa)
Record Identifier
Abstract
STATISTICAL CONTROL OF THE WEIGHTS
OF CEMENT BAGS IN A PACKING PLANT.
1. Introduction -
Alpha Cement Dudfield is a cement producing facility situated ± 25 km
west of the North West Province town of Lichtenburg. It has a
production capacity of over the 5000 tons of clinker per day and
produces an average of 35 000 bags of 50 kg cement per day.
Due to this large amount of bags produced on a daily basis slight
weight deviations in the average weight of the bags may result ,over a
long period, in a significant loss or gain of cement. This loss or gain of
cement may mean a profit or a loss to the company and the client. To
ensure continuous consumer satisfaction the loss or gain of cement
can be minimised by proper control of the weights of the cement bags
produced.
A Rotary packer equipped with accurate electronic weighing
equipment precisely measures the bag weight of each bag that it
produces. By applying probability theory we aim to ensure the optimum
production rate of this packer within given standards.
2. Objective -
The objective of the project is the application of the normal distribution
to a cement bag filling process in order to control the weights of the
bags within certain parameters. This includes a literature study on
probability with the focus on the normal distribution, a literature study
on decision making using the normal distribution, a literature study on
process control using the normal distribution and a case study on the
control of an eight spout cement packer using the theory discussed.
3. Summary of results -
The SABS tolerances specified per bag of cement are between
150 grams underweight and 250 grams overweight. To ensure that
these tolerances are met, continuous control of the bag weights are
necessary. By analysing the bag weight data by means of the normal
distribution, useful information regarding tonnage gained or lost can be
estimated. This information can also be used in a reactive way by
setting up control charts and by reacting early on warning signs given.
The standard deviation and average for 1996 and 1997 are
determined and discussed. Possible mechanical deviations on the
packer are identified as well as ways of overcoming them.
4. Conclusion -
By correctly using the normal distribution to identify possible problem
areas in the control of the weights of cement bags, the amount of
cement lost by the company and the customer can be minimised. This
not only leads to satisfied customers but to long term financial gain for
the company.
Sustainable Development Goals
Description
MBA, North-West University, Potchefstroom Campus
