• Login
    View Item 
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    •   NWU-IR Home
    • Electronic Theses and Dissertations (ETDs)
    • Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    An integrated ventilation and cooling strategy for mechanised deep-level mining

    Thumbnail
    View/Open
    Labuschagne AA Final.pdf (5.325Mb)
    Date
    2022
    Author
    Labuschagne, Austin André
    Metadata
    Show full item record
    Abstract
    Planning of mine ventilation and cooling ensures acceptable environmental conditions underground. To this end, simulation-based planning tools are used for their advantages over calculation-based planning techniques. Various studies and literature on mine ventilation planning exist but tend to neglect certain heat sources, life-of-mine planning considerations, and continuous monitoring. Deep-level mining operations have an increased need for temperature control while pollutant emissions decline with the application of improved technologies. By analysing literature on mine planning strategies, a generic methodology was proposed in this study with a focus on the simulation of life-of-mine models, temperature and pollutant control, integration with existing planning structures, and continuous monitoring. Surveys and plans for the mining environment were used to construct the baseline and future models, which were verified by calculations and audit values. Required airflows and temperatures were calculated from regulation and used to analyse future model results, alongside mine management. Solutions to identified issues were proposed, evaluated, and implemented alongside future model updates. In the case study, an additional 6.5-MW surface cooling plant was constructed to address the cooling shortfall identified. Post-construction surveys of the mining environment revealed a model error of 36.6% for airflow, 16.5% for wet- and 17.8% for dry-bulb temperatures. The errors were subsequently reduced to 12.2%, 5.4% and 5.5% respectively after implementing updates related to deviations from the plan. The errors were deemed acceptable in the light of measurement limitations and the proposed methodology was successfully used to predict the ventilation and cooling infrastructure requirements and impact thereof on one mechanised deep-level mine, while improving on the inherent errors related to non-continuous planning strategies.
    URI
    https://orcid.org/0000-0002-4193-7786
    http://hdl.handle.net/10394/39372
    Collections
    • Engineering [1352]

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of NWU-IR Communities & CollectionsBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsAdvisor/SupervisorThesis Type

    My Account

    LoginRegister

    Copyright © North-West University
    Contact Us | Send Feedback
    Theme by 
    Atmire NV