This paper presents an investigative case study and energy efficiency analysis of the 405 km, 420 kV transmission line between Insukamini
substation in Bulawayo in Zimbabwe and the Matimba thermal power station in South Africa. Three scenarios were evaluated: 1) where a
line to ground fault occurred on the secondary bus, 2) where an impedance fault occurred on the two transmission lines and 3) where the
combination of the above two faults occurred. An analysis was made on the energy efficiency of the load with respect to the three scenarios
by means of a simulation model