Show simple item record

dc.contributor.authorEls, Lötter Adriaan
dc.date.accessioned2015-11-23T13:04:04Z
dc.date.available2015-11-23T13:04:04Z
dc.date.issued2015
dc.identifier.urihttp://hdl.handle.net/10394/15212
dc.descriptionMIng (Mechanical Engineering), North-West University, Potchefstroom Campus, 2015en_US
dc.description.abstractWater Treatment Plants (WTPs) supply potable water which is transferred by pumps to various end users. WTPs and other sub-systems are energy intensive with pump installed capacities varying between 75 kW – 6 000 kW. It has therefore become important to optimise the utilisation of WTPs. Cost savings can be achieved and the load on the national grid can be reduced. The aim of this study is to develop and implement load management strategies on a municipal WTP. In this investigation the high lift pumps are deemed to be the largest consumers of electricity. Strategies to safely implement load management on a WTP were researched. By optimising the operations of the pumps, significant cost savings can be achieved. Comparisons between different electricity tariff structures were done. It was found plausible to save R 990 000 annually, on a pumping station with four 1 000 kW pumps installed, when switching to a time-of-use dependent tariff structure. Strategies to optimise plant utilisation while attempting a load management study include the optimisation of filter washing methods and raw water operations. An increase of 34% in efficiency for a filter backwash cycle was achieved. To accommodate the effects of the load management on the WTP, the operation of valves that allow water to distribute within the plant was also optimised. The implemented control strategies aimed to accomplish the full utilisation of the WTP and sub-systems to achieve savings. An average evening peak period load shift impact of 2.21 MW was achieved. Due to filter modifications the plant is able to supply 5% more water daily. A conclusion is drawn regarding the success of the strategies implemented. Recommendations are made for further research.en_US
dc.language.isoenen_US
dc.subjectWater treatment planten_US
dc.subjectLoad managementen_US
dc.subjectLoad shiften_US
dc.subjectPump schedulingen_US
dc.subjectDemand-Side Management (DSM)en_US
dc.titleLoad management on a municipal water treatment planten
dc.typeThesisen_US
dc.description.thesistypeMastersen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record